The second public announcement of the environmental impact assessment of the reconstruction and expansion project of Kunyao Group Chongqing Wulingshan Pharmaceutical Co., Ltd.
Author:
The second public announcement of the environmental impact assessment of the reconstruction and expansion project of Kunyao Group Chongqing Wulingshan Pharmaceutical Co., Ltd.
According to the relevant provisions of the "Interim Measures for Public Participation in Environmental Impact Assessment", the relevant information on the environmental impact assessment of the "Reconstruction and Expansion Project of Kunyao Group Chongqing Wulingshan Pharmaceutical Co., Ltd." is now announced.
1. Name and summary of construction project
1. Project overview
Project name: Reconstruction and expansion project of Chongqing Wulingshan Pharmaceutical Co., Ltd. of Kunyao Group
Construction unit: Kunyao Group Chongqing Wulingshan Pharmaceutical Co., Ltd.
Construction site: No. 108, Jinyuan Avenue South Road, Banxi Industrial Park, Youyang County, Chongqing
2, construction content
The total investment of the project is 42 million yuan. Upgrade and transform the existing plant area, add some new equipment, build 700t/a hesperidin extracted by alcohol, 300t/a hesperidin extracted by water, 12 million boxes/a (100ml/box) of hesperidin, and supporting construction of sewage Processing plant, storage tank area, boiler, etc.
2. Environmental quality status
(1) Atmosphere
The maximum occupancy rate of SO2, NO2, PM10, PM2.5, ammonia, hydrogen chloride, and non-methane total hydrocarbons at each monitoring point is less than 100%, and there is no over-standard phenomenon. The atmospheric environmental quality of the area where the proposed project is located can meet the second-level standard in the "Ambient Air Quality Standard" (GB3095-2012), and the regional environmental air quality is relatively good.
(2) Surface water
The standard index values of the factors such as pH, COD, BOD5, petroleum, ammonia nitrogen, total phosphorus, total nitrogen, sulfide, etc. of the monitoring section are all less than 1.0, and each monitoring factor meets the Ⅲ of "Surface Water Environmental Quality Standard" (GB3838-2002) The environmental quality of surface water is good.
(3) Acoustic environment
The noise monitoring value of the area where the proposed project is located meets the requirements of the Class 3 zone standard in the "Sound Environmental Quality Standard" (GB3096-2008). The sound environment around the proposed project is of good quality.
(4) Groundwater
PH, ammonia nitrogen, nitrate nitrogen, nitrite nitrogen, volatile phenols, cyanide, arsenic, mercury, chromium (hexavalent), total hardness, lead, fluoride, cadmium, iron, manganese, dissolved Factors such as total solids, permanganate index, sulfate, chloride, etc. all meet the requirements of Class III standards in the "Groundwater Quality Standard" (GB/T14848-2017).
(5) soil
The pH, cadmium, lead, mercury, chromium, arsenic, nickel, copper, and zinc of each monitoring point meet the standard requirements of the "Soil Environmental Quality Construction Land Soil Pollution Risk Control Standard (Trial)" (GB36600-2018).
3. Environmental protection measures
(1) Waste gas pollution control measures
The waste gas of the proposed project mainly includes recovery of solvent non-condensable gas, distillation non-condensable gas, dry waste gas, etc. The main pollution factors are dust, HCl, methanol, non-methane total hydrocarbons, etc. Dust-containing exhaust gas is discharged through a 15m high exhaust cylinder after being treated by "bag dust removal", and exhaust gas containing HCl, methanol, and non-methane total hydrocarbons is discharged through a 15m high exhaust cylinder after being treated by "washing + activated carbon adsorption".
(2) Wastewater pollution prevention and control measures
The waste water produced by the proposed project is mainly process waste water, equipment cleaning waste water, ground washing waste water, etc. The main pollution factors are COD, ammonia nitrogen, etc., through the "grid + regulation + precipitation + hydrolysis + biochemical + decolorization" treatment to achieve "comprehensive sewage discharge" Standard" (GB8978-1996) three-level standard and discharged into the park's sewage treatment plant for further treatment and discharge up to the standard.
(3) Noise pollution control measures
The main noise sources of the proposed project are transfer pumps, vacuum pumps, fans, etc., which are continuously generated. By selecting low-noise equipment, sound insulation, and vibration reduction measures, all noise sources are subjected to noise reduction treatment to ensure that the environmental noise at the plant boundary during the project operation period reaches the standard .
(4) Solid waste pollution prevention and control measures
The solid waste in the production process of the proposed project is mainly extraction residue, waste resin, waste mineral oil, etc. The extracted residue is used as fuel and sent to the boiler for incineration; waste resin, waste mineral oil, etc. are hazardous waste, temporarily stored in the temporary storage site of hazardous waste in the factory area, and regularly entrusted to qualified units for disposal. The transfer of hazardous waste is strictly in accordance with the "Hazardous Waste Transfer Order Management Measures 》Fill in the hazardous waste transfer form.
(5) Groundwater pollution prevention and control measures
The groundwater pollution prevention and control measures of the proposed project are divided into active measures and passive measures. Active measures include: strengthening recycling, reducing waste water production from the source, reducing pollutants running, emitting, dripping, and leaking; passive measures include: zoning Anti-seepage treatment measures. Set up groundwater pollution monitoring wells, regularly collect water samples from the wells, and monitor and analyze the collected water samples.
(6) Risk prevention measures
Install detection and alarm devices, set up cofferdams in tank farms, set up wastewater collection systems in production workshops, set up accident wastewater collection systems and accident wastewater collection pools throughout the plant, formulate emergency plans, establish emergency rescue organizations and other environmental risk prevention measures.
Four, environmental impact
(1) Atmospheric environmental impact
Atmospheric prediction results show that the predicted values of various predictive factors meet the requirements of relevant quality standards and have little impact on various points of interest. The atmospheric environment impact of the proposed project is relatively small.
(2) Water environmental impact
The process waste water, equipment cleaning waste water, and ground washing waste water of the proposed project will be discharged into the park after being treated with "grid + adjustment + precipitation + hydrolysis + biochemistry + decolorization" to reach the third level of the "Integrated Wastewater Discharge Standard" (GB8978-1996) The sewage treatment plant is further processed and finally discharged into the Yudai River. The project has a small impact on the water environment.
(3) Noise influence
It is predicted that after the operation of the proposed project, the day and night noise impact values of the surrounding plant boundaries will meet the category 3 standard limits of the "Environmental Noise Emission Standards for Industrial Enterprise Plant Boundaries" (GB12348-2008).
(4) Solid waste impact
The solid waste in the production process of the proposed project is mainly extraction residue, waste resin, waste mineral oil, etc. The extracted residue is used as fuel and sent to the boiler for incineration; waste resin, waste mineral oil, etc. are hazardous waste, temporarily stored in the temporary storage site of hazardous waste in the factory area, and regularly entrusted to qualified units for disposal. The transfer of hazardous waste is strictly in accordance with the "Hazardous Waste Transfer Order Management Measures 》Fill in the hazardous waste transfer form. Solid waste has little impact on the environment.
(5) Environmental risk
The risk value of the proposed project is relatively small, lower than the accident risk rate acceptable to the industry, and the risk level is acceptable.
5. Preliminary conclusions of environmental impact assessment
The proposed project complies with the national industrial policy. The waste water, waste gas, noise and solid waste produced by the project can be discharged up to the standard after the corresponding pollution control measures are taken, and the impact on the water environment, ambient air and acoustic environment is small. The environmental risks of the project are preventable and controllable, and the environmental risks are acceptable. Under the premise of implementing the environmental protection measures and environmental risk measures proposed in this evaluation, the proposed project has low environmental risk and low impact; pollution control measures are reliable, and the control measures proposed in the evaluation meet the requirements of pollutant discharge, total control and Cleaner production is feasible from the perspective of environmental protection.
VI. Construction unit and contact information
Construction unit: Kunyao Group Chongqing Wulingshan Pharmaceutical Co., Ltd.
Address: No. 108, Jinyuan Avenue South Road, Banxi Industrial Park, Youyang County, Chongqing
Contact: Minister Liu
Tel: 13709496777
Email: 273800777@qq.com
Seven, environmental impact assessment agency and contact information
Evaluation unit: Zhonghuan Lianxin (Beijing) Environmental Protection Co., Ltd.
Certificate Number: National Environmental Assessment Certificate No. 1058
Address: 3109, Building 5, Shidaitian Street, Longhu, Yuzhong District, Chongqing
Contact: Wu Gong
Contact number (fax): 023-68075970
Email: 283535161@qq.com (Please specify the subject of the email: Public Opinions on the Reconstruction and Expansion Project of Chongqing Wulingshan Pharmaceutical Co., Ltd. of Kunyao Group)
8. Scope and main items for soliciting public opinions
The scope of soliciting public opinions is mainly the residents around the project, enterprises and institutions, management departments and people from all walks of life who are concerned about the construction of the proposed project. The main content of the solicitation is as follows:
(1) Attitudes towards the construction of the proposed project; if objections are raised, the main objections shall be raised;
(2) The possible impact of the construction of the proposed project on the surrounding environment;
(3) Do you think the proposed project is conducive to the social and economic development of the region;
(4) Reasonable suggestions on environmental protection measures for the proposed project;
(5) What impact will the construction of the proposed project have on your life and work;
Nine, the form and time of public feedback
This announcement is the second announcement of the environmental impact assessment of the proposed project. From now on, within ten working days, the public can contact the construction unit or environmental impact assessment agency to obtain supplementary information on the environmental impact assessment of the proposed project, and designate it to the public Send feedback in the form of letters, faxes, e-mails, etc. to the address, express opinions and suggestions on the construction of the proposed project, and provide detailed contact information when expressing opinions.
Thank you for your enthusiastic participation and strong support for the construction and environmental protection work of the
Chongqing Wulingshan Pharmaceutical Co., Ltd. of Kunyao Group.
October 24, 2018
Latest News
2018-11-19
Announcement of the full text of the environmental impact report of the renovation and expansion project
According to the relevant provisions of the "Environmental Impact Assessment Law" and the "Interim Measures for Public Participation in Environmental Impact Assessment".
2018-10-24
The second public announcement of the environmental impact assessment of the reconstruction and expansion project of Kunyao Group Chongqing Wulingshan Pharmaceutical Co., Ltd.
According to the relevant provisions of the "Interim Measures for Public Participation in Environmental Impact Assessment", the relevant information on the environmental impact assessment of the "Reconstruction and Expansion Project of Kunyao Group Chongqing Wulingshan Pharmaceutical Co., Ltd." is now announced.
2018-10-08
Kunyao Group Chongqing Wulingshan Pharmaceutical Co., Ltd. Reconstruction and Expansion Project Environmental Impact Assessment Public Participation First Public Announcement
According to the relevant provisions of the "Interim Measures for Public Participation in Environmental Impact Assessment," combined with the characteristics of the construction project
2015-10-06
2015 company employee training
From September 29th to 30th, 2015, the company took pictures after training all employees on safety, GMP, ICQ7, TPM and corporate culture.
2015-01-23
Chongqing Huafang Wulingshan Pharmaceutical Co., Ltd. Enterprise Technology Center
Chongqing Huafang Wulingshan Pharmaceutical Co., Ltd. is recognized as a municipal enterprise technology center